Urgent orders shipped smoothly by Air

 Project Location: Australia

Product: Flange

Specification: DN200 CLASS600

Standard & Grade:ASTM A105

Usage: slurry transmission project

Received the inquiry in Dec 2022.

Signed the contract in Jan 2023

Shipped time: From Jan- Feb, 2023

Arrival time: Mid Feb, 2023

At the End of Dec in 2022, Xinyue received an enquiry of 20tons Flanges from our regular client for mining slurry transmission project in Australia. The customer requires all flanges to arrive at destination within one month, and these flanges are not common pressure thickness. Therefore, we don’t have any available stocks and need to book the special customized mould. In order to meet customer needs, Xinyue Steel immediately contacted with the production department to prepare raw materials in advance, and book the mould, and according to customer requirements to contact with our air freight forwarder, reserving good shipping space in advance.

Since the Spring Festival was approaching, the production capacity and air freight space were all very tight. In order to help the customers catch up with the delivery date, the workers of the production department worked overtime and postponed the holiday. The freight forwarder also tried their best to cooperate until the first batch of air cargo was successfully shipped on the 29th of Chinese New Year. Up to now, all the goods have been well sent out as scheduled and successfully delivered to destination. Our customers highly appreciated to our professional service and efficient operation.

https://www.xysteelpipe.com/urgent-orders-shipped-smoothly-by-air/

评论

此博客中的热门博文

The main reason for the porosity of submerged arc welding seam

Standard for Choosing Oil Casing Pipe Manufacturers

How to distinguish between ERW steel tube and seamless steel tube?