博文

目前显示的是 十月, 2022的博文

After 3 year’s negotiation, Xinyue was awarded a new coastal construction project in South America

Project location:South America Product:SSAW Steel Pipe Standard and material:API 5L X65 Specifications:914x22mm Application:Marine construction Inquiry time:2019.12 Order time:2022.09 Shipping time:2022.12 Estimated arrival time:2023.02 After decades of development since the founding of Xinyue Steel, we have successfully worked on numerous projects, large and small, with various regions and countries around the world.Xinyue has been established for decades and has participated in numerous large and small projects. The project follow-up period is generally measured in years. Our company usually starts to participate in the early stage of project design, providing customers with excellent prices and professional advice to complete the initial budget. And design, and then continuously update customers so that customers can purchase at the best price to save costs. The project we are talking about today, Xinyue has been involved in it since we first received the inquiry from the customer i...

Carbon steel welded pipe production process

Carbon steel welded pipes are mainly divided into three processes: electric resistance welding (ERW), spiral submerged arc welding (SSAW) and straight seam submerged arc welding (LSAW). The carbon steel welded pipes produced by these three processes have their own positioning in the application field because of their different raw materials, forming processes, caliber size and quality. 1. Straight seam electric resistance welded pipe (ERW) Electric resistance welded pipe is the earliest type of steel pipe produced in my country, with the widest range of applications, the largest number of production units (more than 2,000), and the highest output (accounting for about 80% of the total production capacity of welded pipes). The product specification is Ф20~610mm. played an important role. Since the 1980s, about 30 sets of ERW219-610mm units have been imported from abroad. After years of production practice, the equipment technology level has made great progress, and the product quality i...

Xinyue serves the Chile government bridge construction project

Project Location:Chile Products:LSAW steel pipe with welding shoes Size:800*18mm / 855*25mm Standard:ASTM A252 ASTM A572 GR. 50 Coating requirement: Bare Pipe Application:Bridge construction Inquiry time:2022.4 Order time:2022.5 Shipping time:2022.5 Estimated arrival time:2022.7 The order is from a regular client in Chile. It took about one month from inquiry to place order. The reason for so fast transaction is that the client’s great trust to the Xinyue excellent service and good quality. The end user has strict requirement for the goods quality and the design requirement. Once Xinyue received the client project, we build a technical team for the client project, to provide professional solutions to all the technical terms and drawing detail, , the specification of the welding, strict technical requirements of welding, and provide the best price solution,to finally win the end user project. https://www.xysteelpipe.com/xinyue-serves-the-chile-government-bridge-construction-project/

Xinyue’s conventional inventory boosts the quick transaction of Korean orders

Tianjin Xinyue Steel Group integrates steel pipe production, inventory, and domestic &foreign sales, covering steel pipe galvanizing, anti-corrosion, thermal insulation , and other processing area. who are one of the largest steel pipe and deep processing enterprises in China. This order benefited from the sufficient inventory of Xinyue warehousing base, which Covers an area of more than 80 mu, with an outdoor material storage area of 30,000 m², and the warehouse of 10,000 m². It has long-term stock of common specifications to meet the urgent needs of many projects. Warehousing products cover spiral pipes, straight seam pipes, seamless pipes, square and rectangular pipes, carbon steel pipe fittings, valves, pile pipes, and scaffolding safety systems of various materials. Project location:Korea Product:LSAW STEEL PIPE Standard and material:GB/T 3091 Q235B Specifications:1016*22*12000MM Application:Crane manufacturing Inquiry time:2022.03.26 Order time:2022.03.30 Shipping time:2022.0...

Xinyue helps Kazakhstan customers win new projects again

Project location: Kazakhstan Product: Seamless pipe + straight seam welded pipe Standard material: GOST 8732-78 CT.20/ GOST 20295-85 K52, K54 Specifications: 57-820mm Application: transport natural gas inquiry date:2022.08.05 Order date:2022.09.01 Estimated delivery date: 2022.10.20 Estimated arrival date:2022.11.15 In 2022, Xinyue has helped Kazakhstan customers to win more than 10 projects. In September, once again helped the customer to successfully win the natural gas transmission project. Project procurement specifications are divided into seamless steel pipes and straight seam welded pipes. Among them, the straight seam welded pipe requires external 3LPE anti-corrosion, and internal epoxy paint anti-corrosion. The pipe is required to meet the impact requirement of 19.6J at a temperature of -40 degrees. Xinyue has carefully checked the technical requirements of customers in the early stage of quotation, and provided customers with feasible and competitive solutions to help custome...

Coated steel pipe from Xinyue Steel support European Marine Piling Project

Project location:France Product:SSAW steel pipe Standard and material:EN10219 S355JR Specifications:914mmX 20mm Usage:Marine Piling Project Inquiry time:2022-01-15 Order time:2022-03-25 Shipping time:2022-5-25 Arrival time:2022-07-06 I met this French customer in 2018. The customer visited the factory twice, and was very satisfied with the equipment, professionalism and management of the factory, and placed orders for Xinyue in the next few years. This order is for 914 pile pipes, with a total of more than 400 tons. As it is a marine pile pipe project, the outer surface of the steel pipe needs Hempel’s epoxy coating and the shipment also needs to be very professional and careful. After more than 1 month of production, all the coated pipes have been produced and passed the comprehensive inspection by a third party. Considering the fragility of the coated pipe, the packaging is factory-installed. Each pipe has been added with 8 cloth ropes and the pipe ends are equipped with slings. At t...

Xinyue Steel Continuous supply African oil platform valve replacement project

Project Location: Africa Product: Valve Specification:3” 600LB Standard and steel grade: ASTM A216 WCC+ENP Usage:Oil transmission Inquiry time:2022.05.07 Order time:2022.05.09 Delivery time: 2022.06.30 Arrival time:2022.08.10 At the beginning of May, an old African customer sent a message that the oil platform replacement valve supplied by Xinyue had been put into use successfully last year, and once again expressed his appreciation for the quality and delivery time of Xinyue valve. Due to the smooth supply of the first batch of valves, customers are full of trust in Xinyue, client has directly contact Xinyue for second batch of replacement projects. After Xinyue confirmed the detailed technical requirements with the customer, the customer said that everything was carried out in accordance with the requirements of last year’s order. After that, the customer readily signed a contract for the second batch of valves with Xinyue. Currently, the production of the second batch of valves is i...

LSAW pipe welded with flange & plate from Xinyue Steel to Cote D’Ivorie

Project location:Cote D’Ivorie Product:LSAW pipe welded with flange & plate Standard and material:EN10219 S355JR, EN10025 S235JR, EN1090-2 Specifications:DN400 – DN800, length in1-12m Usage:Steel prop for shoring Inquiry time:2022.6.22 Order time:2022.8.30 Shipping time:2022.12 Estimated arrival time:2023.2 At the end of June 2022, Tianjin Xinyue received an inquiry from a French customer for steel pipe processing parts. EN10219 S355JR steel pipe OD 406-813mm. The pipe ends are welded with rectangular plates or circular plates at different angles. At that time, the customer had 2 options in consideration: Option1: The length of pipes shall be completely consistent with the project requirements, and the finished products shall be provided at 1-31.4m; Option2: Semi finished products are supplied at 12 meters, and the customer will conduct further pipe cutting and welding processing at the project site; The advantages and disadvantages of these two options are obvious: For option1, th...

FBE coated anticorrosive spiral welded pipe

The outer coating of welded pipe FBE fused epoxy powder (FUSION BOND EPOXY) anti-corrosion steel pipe is a new type of anti-corrosion coating developed in the past 30 years. The coating has the characteristics of simple coating operation, no pollution, good impact resistance and bending resistance, and high temperature resistance, and has been widely used abroad. Powder coating is a solvent-free solid powder coating, which has the characteristics of no solvent, no pollution, saving energy and resources, reducing labor intensity and high mechanical strength of the coating film. They are stable in storage at room temperature. After electrostatic spraying, friction spraying (thermosetting method), or fluidized bed dipping (thermoplastic method), they are then heated and baked to melt and solidify to form a flat and bright permanent coating to achieve decoration. and anti-corrosion purpose. Production process of FBE epoxy powder anti-corrosion spiral welded pipe: Spiral welded pipe FBE coa...

Another successful delivery of a replacement valve project in Nigeria

Project location:Nigeria Product:Valve Standard and material:ASTM A216+ WCB Specifications:3/4” to 2” Usage:oil platform valve replacement Inquiry time:2022.7.25 Order time:2022.08.01 Shipping time:2022.09.15 Estimated arrival time:2022.11.05 In July, an regular Nigerian customer sent an inquiry. The content of the inquiry was the oil platform valve project cooperated at the beginning of the year. The customer informed that another batch of valves has reached the end of its service life and needs to be customized for an alternative use. Due to the long service life, the customer has lost the design drawings of the valve. Considering that it is a replacement project, the slight gap in the specifications may cause the customer to not be able to use it. In this regard, Xinyue has carried out detailed communication with customers, and entrusted customers to take detailed pictures of valves on the platform. According to the pictures and some technical details provided by the customer, Xinyu...